NSW TrainLink to trial satellite Wi-Fi on one XPT and one Xplorer
Transport for NSW will run a three-month, $1.5 million trial of free onboard Wi-Fi that combines low Earth orbit satellite and 4G/5G links, and the results will shape any rollout across the XPT and Xplorer fleets.
Transport for NSW is preparing a three-month trial of onboard Wi-Fi on NSW TrainLink, starting in late 2026, with one XPT and one Xplorer carrying both satellite and 4G/5G connections. The project is fully funded at $1.5 million, and passengers on both trains will not pay to use the service. The agency said the trial will examine how the system performs on regional, rural and interstate routes, including sections where mobile coverage can be patchy.
Equipment on each train's roof will link to a low Earth orbit satellite constellation as well as to ground-based mobile networks, while antennas and access points inside the cars distribute the signal. The system chooses the best connection by itself, and the switch between links is designed to go unnoticed by users. Both fleets were built long before Wi-Fi on trains became common, and their tinted windows can weaken phone signals on long journeys.
A competitive procurement process led to the proof-of-concept work being awarded to MA Connected Intelligence, the Australian arm of British firm Motion Applied. A Sydney team will handle detailed design and delivery. Motion Applied said in its own announcement on 30 September that it had beaten Icomera and Nomad Digital to become preferred supplier. Starlink will provide the satellite link, and Motion Applied's Fleet Connect software will send data along the strongest path. The supplier outlines a 14-car proof of concept, then two more contracts for the remaining cars in the XPT fleet's 77 and the Xplorer fleet's 23, along with an initial three-year operations contract.
Any further step depends on the trial's results. At a Budget Estimates hearing on 10 March, NSW TrainLink Chief Executive Roger Weeks outlined three phases: a three-month proof of concept, Wi-Fi across all XPT and Xplorer trains if the expected benefits materialise, and then Wi-Fi on the new regional fleet. NSW Minister for Roads and Regional Transport Jenny Aitchison said the government would listen to feedback and use the results to "understand what works, where the technology performs best, and what's needed for a wider rollout".
Earlier trials under the Regional Digital Connectivity Trials program included free Wi-Fi at Nambucca Heads Station and cellular repeaters on selected intercity services. A six-week Starlink test in 2023 on the Dubbo to Broken Hill coach delivered steadier connectivity than mobile networks alone through known black spots. Motion Applied has used the same setup on a Great Western Railway train in the UK, and its June 2026 summary reported 900 Mbps of average available throughput, 99.75% hybrid network availability and more than 31,000 passenger devices supported. Those figures come from the supplier itself.
The 29 CAF-built Regional Rail trains will eventually replace the XPT, Xplorer and Endeavour fleets, yet the feature list Transport for NSW publishes for them makes no mention of passenger Wi-Fi. Meanwhile the XPTs are undergoing a five-year, $40.3 million life extension project.